Skip to main content

Featured

Mobilization: The Most Expensive Part of a Dredging Job Nobody Talks About

   Mobilization: The Most Expensive Part  of a Dredging Job Nobody Talks About When people think about the cost of a dredging project, they usually focus on production. •How much material will be moved. •How long the job will take. •What the equipment is capable of. What rarely gets the attention it deserves is what happens before production even begins.  Mobilization. •Getting equipment to the jobsite. •Setting it up. •Getting it operational. It doesn’t show up in production numbers. But it directly impacts everything that follows. WHAT MOBILIZATION REALLY INCLUDE S Mobilization is often viewed as a single step.  In reality, it’s a series of events that must align correctly: •Transporting equipment to the site •Staging and positioning components •Assembling systems •Connecting and testing •Preparing for production Each step introduces potential delay.  And each delay pushes production further out. WHERE TIME IS LOST Mobilization is one of the most underest...

The VMI Dredges Swamp Hoe is Rolling Out to Missouri!

The VMI Dredges Swamp Hoe is Rolling Out to Missouri!

When the job calls for tough terrain and deep digging, this beast delivers. The VMI Swamp Hoe is built to tackle marshes, wetlands, and more, getting the job done where others can’t.
Missouri, get ready. This machine is coming to make an impact!
Swamp Hoe Dredging Aint Easy

 https://youtube.com/shorts/jyN4seJxkR0?feature=share

VMI Dredges Logo

Pat Sumpter, Sales Manager, 918-225-7000, Ext. 12

www.vmidredges.com • sales@vmidredges.com

Call Now       Email Us

Comments