Skip to main content

Featured

Stop Guessing: How the VMI Edge Dredge Calculator Helps Build a Better Dredging Plan

   Stop Guessing: How the VMI Edge Dredge Calculator Helps Build a Better Dredging Plan A dredging project contains too many expensive variables for guesswork. Material characteristics, slurry concentration, flow rate, pipeline length, elevation changes, production goals and pump requirements all influence the system needed to complete a job. Change one variable and the effect can travel through the entire operation. The VMI Edge Dredge Calculator was developed to help bring those variables into one practical planning environment. It does not replace project-specific engineering or an experienced dredging professional. It gives users a clearer place to begin, a faster way to compare scenarios and better questions to ask before equipment reaches the water. A Dredge Is Part of a System It is easy to begin project planning by asking which dredge model is needed. That question matters, but it is rarely the first question that should be answered. A dredge works as part of a complet...

Amphibious Pontoons

 

AMPHIBIOUS PONTOONS

 Amphibious Pontoons

AM80
7-8 Metric Tons
15,400-17,600Lbs.

AM140
12-14 Metric Tons
26,400-30,800Lbs.

AM200
20-23 Metric Tons
44,000-50,700Lbs.

AM250
24-27 Metric Tons
52,900-59,500Lbs.

AM80
28-30 Metric Tons
61,700-66,100Lbs.

AM350
33-38 Metric Tons
72,700-83,700Lbs.

Comments