Mobilization: The Most Expensive Part of a Dredging Job Nobody Talks About

   Mobilization: The Most Expensive Part  of a Dredging Job Nobody Talks About When people think about the cost of a dredging project, they usually focus on production. •How much material will be moved. •How long the job will take. •What the equipment is capable of. What rarely gets the attention it deserves is what happens before production even begins.  Mobilization. •Getting equipment to the jobsite. •Setting it up. •Getting it operational. It doesn’t show up in production numbers. But it directly impacts everything that follows. WHAT MOBILIZATION REALLY INCLUDE S Mobilization is often viewed as a single step.  In reality, it’s a series of events that must align correctly: •Transporting equipment to the site •Staging and positioning components •Assembling systems •Connecting and testing •Preparing for production Each step introduces potential delay.  And each delay pushes production further out. WHERE TIME IS LOST Mobilization is one of the most underest...

Stop by and see the VMI Dredges Team at booth 36 in Tampa, Florida WEDA

 Stop by and see VMI Dredges team at booth 36


Attendees at WEDA 2024 in Tampa, Florida, proudly model the back of the new Swamp Hoe shirts. The group enthusiastically showcases the bold and innovative design, highlighting the shirt's popularity and the excitement surrounding the event.

VMI President Cash Maitlen and VMI Shop Foreman Joe McAllister at the VMI Dredges WEDA Booth in Tampa, Florida

VMI Dredges President Cash Maitlen and wife Melissa wearing the new VMI Dredge Swamp Hoe T-shirts in Tampa, Florida

VMI Dredges Sales Manager Pat Sumpter and VMI Dredges Shop Foreman Joe McAllister at VMI Dredges WEDA Booth in Tampa Florida

VMI Dredges President Cash Maitlen and Shop Foreman Joe McAllister at WEDA Booth in Tampa Florida








Comments